Bally 8 Ball Deluxe makeover:
I used toothpicks to fill in the letterings.
Overall it turned out pretty good, not as good
as replacing the play field but a lot cheaper and a lot less time. I think
it took me
a total of 8-10 hrs to touch up the play field.
That included stripping most of the top parts off and reassembly.
I finished the play field off with 3 coats of clear
coat. To eliminate the brush strokes, I used a roller to apply the clear
coat to the main
areas and a brush only on the tight places.
Before
After
Home | Next Picture